Video duration: 496 seconds
Global video hits: 6223
6 month delivery delay... Damnit! This is an interview with Tom Cogan, chief project engineer for the Boeing 787 Dreamliner. He talks about the design and production of the 787 including crucial avionic flight software which is one of the factors cited for the delay of the maiden flight and EIS (entry into service).
Video duration: 225 seconds
Global video hits: 422
WATCH IN HIGH QUALITY!!!
AMD Athlon X2 6000+ 64
2GB RAM DDR2 667
ATI HD3870 HIS 512MB 256bit DDR4
ATI Catalyst, full anti-aliasing and anisotropic filterings.
Microsoft Flight Simulator X SP2
AWESOME BOEING 787 ;D
Video duration: 138 seconds
Global video hits: 2066
Landing at Princess Juliana airport,St. Marteen with the new 787.
Ps. the landing was horrible giving that i didnt know my altitude and speed because i dont know how to turn on the HUD lol.